Neerd.tech

Process

How a Neerd project moves from research to working hardware.

04 · Process

Research to product

Every Neerd project starts from research and testing, like the 2.4 GHz rectenna paper, and carries that work through to working hardware.

{{ s.no }}

{{ s.name }}

{{ s.line }}

The engineering workflow

Seven phases, one thread

The same sequence runs through every project, from a research paper to a flying drone. Each phase ends with something that can be checked.

Friis link budget plot of available Wi-Fi power versus distance
Link budget: available Wi-Fi power vs distance
01

Research & requirements

Define the problem, the constraints and the numbers to hit. Literature review, first-pass calculations and feasibility studies, like the Friis link budget behind the 2.4 GHz rectenna.

Output: requirements, feasibility calcs
System architecture block diagram of a solar-powered piezoelectric crosswalk signal
Crosswalk system architecture
02

System architecture

Break the system into power, sensing, control and output blocks, then select components against the requirements and the budget.

Output: block diagram, part selection
Top and bottom copper layers of a two-layer drone flight controller PCB
Quad-1 copper layers: top (red) and bottom (blue)
03

Schematic & PCB layout

Schematic capture, footprint assignment, component placement and routing, then DRC and ERC until the board is clean and ready for fabrication.

Output: schematic, Gerbers, BOM
Exploded CAD assembly of a quadcopter open-frame body in PTC Creo
Exploded CAD view: Quad-1 open-frame body
04

Mechanical design

Enclosures and structural parts modeled in Creo around the real board and components, with exploded views to check fit and assembly order.

Output: STEP / STL, drawings
Hand-soldering a piezoelectric sensor array for a prototype
Wiring the 24-disc piezo array
05

Build & bring-up

Fabrication, hand assembly and soldering, then power-on, firmware flashing and peripheral bring-up one subsystem at a time.

Output: working prototype
Measured sensor response time versus applied weight
Measured response time vs weight
06

Test & validation

Bench measurements on oscilloscope and supply against the original targets. The crosswalk’s piezo response was characterized from 10 g to 500 g.

Output: measured results
Engineering assembly drawing with bill of materials for a quadcopter body
Assembly drawing with BOM: Quad-1 body
07

Final design & documentation

Revise the prototype into a final design, then release reports, drawings, BOMs and source files so it can be reproduced, reviewed or manufactured.

Output: design package